Some Projects

Upgrading the control system of 25 ton 13 MW and 12 ton 6 MW furnace (Ardabil – Akam Metal Soleh)

– Upgrading the control system of 20 ton 8 MW furnaces of Shanghai Electric – 5 sets of furnaces (Bonab Steel Complex – Shahriar Unit)

– Upgrade of 1.5 ton 600 kW AEG furnace control system (Tabriz Machinery Factory)

– Upgrading the control system of 2 ton 600 kW ABB furnace (Urmia Tractor Foundry)

– Upgrading the control system of the 12 ton 5 MW furnace of the electro-term design (Armenia)

– Upgrading the control system of 10 ton 5 MW Iranian furnaces (Isfahan – Lenjan Steel)

– Upgrading the control system of 8 ton 3 MW EGES furnaces (Tabriz)

– Upgrading the control system of 5 ton 2 MW 5M furnaces (Tabriz)
– Design and manufacture of new generation FMC coils for 8 ton and 12 ton furnaces

– Setting up a 6-ton furnace under ABB vacuum

– Commissioning, repairing and upgrading the control of the 50 kW contactless power transmission system (Vahle Company of Germany)

– Setting up a 4 ton ABB furnace

– Design and construction of a power control system authorized by the factory with 3 induction furnaces of 4 MW and the elimination of electrical crimes

– Design and construction of a monitoring system for a rafting motor in the rolling line

– Design and manufacture of earth leakage detection system for all types of parallel furnaces, series-parallel

– Design and manufacture of inverter, rectifier and digital control panel for 2MW 5 ton Elotherm furnace (Germany)